PROJECT #2 FACT SHEET
Date completed:
Spring, 2001

| Location |
Healdsburg, California |
| Square footage |
5,000 sq. feet |
| Age of house |
New |
| Energy evaluation
factors |
Insulated ceiling,
walls, & floor; double-pane low-E windows |
| Number of stories |
2 |
| Reason for choosing
geothermal |
Lower utility costs,
life-cycle costs, quiet, safety, minimize the environmental impact |
| Geoexchange system
description |
1 5-ton geoexchange
unit for radiant floor heating (9 zones), 3 geoexchange units of forced
air cooling, 1 geoexchange unit for domestic hot water heat, 1 geoexchange
unit for pool heat |
| Approximate time to
install |
4 months |
| Loop type |
 |
8 - 225 loops |
|